Pratidin
2026 · Civil Engineering Optional Paper II · 15 marksMainsQuestion 7b

Draw a neat sketch of a diversion work (headwork). Briefly explain the functions of the following :
(i) Silt excluder
(ii) Cross regulator
(iii) Canal fall
(iv) Aqueduct
(v) Escape

15 marks · directive: Explain

Answer

The core of a good answer

A diversion headwork consists of a weir or barrage across the river with undersluices, a divide wall, a fish pass where needed, a canal head regulator, silt excluder and river training works; the silt excluder carries settled silt away from the canal head, a cross regulator heads up water in the main canal, a fall drops the canal bed where the ground is steeper, an aqueduct carries the canal over a drain, and an escape releases surplus water safely.

An outline written by upsc.help, not an official UPSC answer; every fact checked by a separate review. How we work

What the question asks

The sketch is a plan of the headworks with its components labelled; the five functions are short notes. Marks go to correct layout (head regulator at an angle just upstream of the weir, undersluice pocket in front of it, divide wall separating the pocket) and to precise functions.

Answer outline

Introduction

Diversion headworks raise the river level and divert a regulated, relatively silt-free supply into an off-taking canal; they do not store water (unlike a dam).

Sketch (plan) to draw

(i) Silt excluder

(ii) Cross regulator

(iii) Canal fall

(iv) Aqueduct

(v) Escape

Conclusion

Together the headwork components divert a controlled, low-silt supply, and the regulation and cross-drainage works carry it safely along the canal.

Examples and data to cite

Facts

Facts to remember

Sources used for the explanation

Write a timed answer in the app