Global ltd., produces an article by blending two basic raw materials. It operates a standard costing system and the following standards have been set for raw materials :
Materials | Standard Mix | Standard rate per Kg
A | 40% | ₹8
B | 60% | ₹6
The standard loss is processing is 15%. During April 2026 the company produced 3400 kg of finished output.
The position of stock and purchases for the month of April 2026 is as under :
Material | Stock 1.4.26 (Kg) | Stock 30.4.26 (Kg) | Purchases during April (Kg) | Purchases during April Cost (₹)
A | 70 | 10 | 1600 | 6800
B | 80 | 100 | 2400 | 6000
Analyse material variance.
15 marks · directive: Analyse
The core of a good answer
Material cost variance is ₹14,195 favourable, made up of a price variance of ₹14,555 favourable and a usage variance of ₹360 adverse; the usage variance splits into a mix variance of ₹88 adverse and a yield (sub-usage) variance of ₹272 adverse.
An outline written by upsc.help, not an official UPSC answer; every fact checked by a separate review. How we work
What the question asks
The method is standard costing material variance analysis: cost variance = price variance + usage variance, and usage variance = mix variance + yield variance. Actual consumption is found from stock and purchase data, and actual prices are taken from purchases.
Answer outline
Introduction
Actual consumption = opening stock + purchases − closing stock. It is assumed that materials issued are valued at the April purchase price (₹4.25 per kg for A, ₹2.50 for B), i.e. opening stock carried the same price. Standard input for 3,400 kg output with 15% loss = 3,400 ÷ 0.85 = 4,000 kg.
Step 1: Actual quantity and cost
- A: 70 + 1,600 − 10 = 1,660 kg at 6,800 ÷ 1,600 = ₹4.25; cost = ₹7,055.
- B: 80 + 2,400 − 100 = 2,380 kg at 6,000 ÷ 2,400 = ₹2.50; cost = ₹5,950.
- Total actual quantity = 4,040 kg; actual cost = ₹13,005.
Step 2: Standard quantity and cost for actual output
- Standard input = 3,400 ÷ 0.85 = 4,000 kg.
- A: 40% × 4,000 = 1,600 kg × 8 = ₹12,800; B: 60% × 4,000 = 2,400 kg × 6 = ₹14,400.
- Standard cost = ₹27,200.
Step 3: Material cost variance
- MCV = SQ × SP − AQ × AP = 27,200 − 13,005 = ₹14,195 (F).
Step 4: Material price variance
- MPV = AQ × (SP − AP).
- A: 1,660 × (8 − 4.25) = ₹6,225 (F); B: 2,380 × (6 − 2.50) = ₹8,330 (F).
- Total MPV = ₹14,555 (F).
Step 5: Material usage variance
- MUV = SP × (SQ − AQ).
- A: 8 × (1,600 − 1,660) = ₹480 (A); B: 6 × (2,400 − 2,380) = ₹120 (F).
- Total MUV = ₹360 (A).
Step 6: Mix variance
- Revised standard quantity (actual total in standard ratio): A 40% × 4,040 = 1,616 kg; B 60% × 4,040 = 2,424 kg.
- Mix variance = SP × (RSQ − AQ): A 8 × (1,616 − 1,660) = ₹352 (A); B 6 × (2,424 − 2,380) = ₹264 (F).
- Total mix variance = ₹88 (A).
Step 7: Yield (sub-usage) variance
- SP × (SQ − RSQ): A 8 × (1,600 − 1,616) = ₹128 (A); B 6 × (2,400 − 2,424) = ₹144 (A); total ₹272 (A).
- Cross-check: expected output from 4,040 kg = 4,040 × 0.85 = 3,434 kg; shortfall 34 kg × standard cost per kg of output (27,200 ÷ 3,400 = ₹8) = ₹272 (A).
Conclusion
MCV ₹14,195 (F) = MPV ₹14,555 (F) + MUV ₹360 (A); MUV ₹360 (A) = mix ₹88 (A) + yield ₹272 (A). The large favourable price variance arises because purchase prices were far below standard.
Examples and data to cite
- If price variance is instead calculated at the point of purchase on quantities bought: A 1,600 × (8 − 4.25) = ₹6,000 (F); B 2,400 × (6 − 2.50) = ₹8,400 (F); total ₹14,400 (F).
Facts to remember
- MCV = (SQ × SP) − (AQ × AP); MPV = AQ × (SP − AP); MUV = SP × (SQ − AQ).
- Mix variance = SP × (RSQ − AQ), where RSQ is the actual total input in standard proportion.
- Yield or sub-usage variance = SP × (SQ − RSQ), or standard cost per unit of output × (actual output − standard output from actual input).
- Check: MCV = MPV + MUV; MUV = Mix variance + Yield variance.