Deforestation in the upper reaches of a river augments the magnitude of soil erosion. Elaborate your answer citing the example of any North Indian river.
15 marks · directive: Elaborate
The core of a good answer
Forests in a river's upper catchment intercept rain, bind soil and raise infiltration; their removal increases surface runoff, landslides and sediment yield, which raises the river's sediment load, silts reservoirs and aggravates downstream floods, as the Alaknanda headwaters of the Ganga showed after the 1970 Alaknanda flood that triggered the Chipko movement.
An outline written by upsc.help, not an official UPSC answer; every fact checked by a separate review. How we work
What the question asks
The candidate must explain the mechanism linking upper-catchment deforestation to soil erosion (hydrological and geomorphic processes) and then elaborate with one North Indian river, showing causes, evidence and effects downstream, and suggest remedies.
Answer outline
Introduction
The upper reaches of Himalayan rivers lie on steep, tectonically active and monsoon-drenched slopes, so vegetation is the main protection against erosion.
Mechanism
- Canopy and litter reduce raindrop impact (splash erosion) and slow overland flow.
- Roots bind soil and add cohesion to slopes.
- Forest soils have high infiltration; their loss converts rain to quick runoff, increasing sheet, rill and gully erosion.
- In USLE terms (A = R × K × LS × C × P), deforestation sharply raises the cover factor C on slopes where LS is already high.
- More sediment is delivered to channels, raising the river's load and causing downstream aggradation, braiding and channel shifting.
Example: Alaknanda (upper Ganga), Uttarakhand
- Reckless deforestation had denuded much of the forest cover of the catchment.
- In July 1970 a landslide blocked the Alaknanda; the flood that followed affected the valley from near Badrinath to Haridwar, about 320 km downstream, washing away villages, bridges and roads.
- Villagers linked the disaster to deforestation, leading to the Chipko movement (Mandal, April 1973; Reni, March 1974) and to a fifteen-year ban on felling in the Himalayan regions announced by Prime Minister Indira Gandhi in 1980.
- In the Kedarnath disaster of June 2013 debris blocked rivers, and environmentalists blamed haphazard road building and hydropower works for part of the damage; the flood of 7 February 2021 in Chamoli damaged the Tapovan Vishnugad hydropower plant.
Remedies
- Catchment area treatment plans for dams, afforestation with native species, check dams and gully plugs.
- Regulating hill roads and hydropower, and participatory forest management (van panchayats of Uttarakhand).
Conclusion
The upper Ganga shows that protecting headwater forests is the cheapest way to control erosion and flood hazards downstream.
Examples and data to cite
- Alaknanda flood of July 1970 after a landslide blocked the river.
- Chipko protests at Mandal (April 1973) and Reni (March 1974, led by Gaura Devi).
- Fifteen-year ban on felling in Himalayan forests announced in 1980.
- Kedarnath floods of June 2013 and Chamoli flood of 7 February 2021.
Facts to remember
- USLE: A = R × K × LS × C × P (rainfall erosivity, soil erodibility, slope length-steepness, cover-management, support practice).
- Sediment yield increases with slope, rainfall intensity and loss of vegetative cover.
- Forest Conservation Act, 1980 requires central approval for diverting forest land.
- Van panchayats in Uttarakhand were first formed around 1921 and expanded under a 1931 law.