A mineral deposit has an estimated volume of 2 million cubic metres. The average density of the ore is 2·5 tonnes per cubic metre. The average grade of the mineral is 3% Cu. Calculate the proven reserves in tonnes and the amount of copper in these reserves.
15 marks · directive: Calculate
The core of a good answer
Proven reserves = 2,000,000 m³ x 2.5 t/m³ = 5,000,000 tonnes (5 million t) of ore, and contained copper = 5,000,000 t x 0.03 = 150,000 tonnes of Cu.
An outline written by upsc.help, not an official UPSC answer; every fact checked by a separate review. How we work
What the question asks
A direct tonnage and metal content calculation: tonnage is volume times bulk density, and metal content is tonnage times grade expressed as a fraction. The answer should state the assumption that the whole estimated volume is treated as proven and that no mining loss or recovery factor is applied.
Answer outline
Introduction
Given: volume V = 2 million m³ = 2 x 10⁶ m³; bulk density ρ = 2.5 t/m³; average grade g = 3 per cent Cu = 0.03. Tonnage is obtained from volume and density, and contained metal from tonnage and grade.
Step 1: Tonnage of ore
- T = V x ρ
- T = 2,000,000 m³ x 2.5 t/m³
- T = 5,000,000 t = 5 x 10⁶ t (5 million tonnes)
Step 2: Copper content
- Cu = T x g
- Cu = 5,000,000 t x 3/100
- Cu = 150,000 t = 1.5 x 10⁵ t of copper metal (in situ)
Step 3: Cross check by tonnage factor
- Tonnage factor = 1/ρ = 1/2.5 = 0.4 m³ per tonne, so T = 2,000,000 / 0.4 = 5,000,000 t.
- Copper per cubic metre = 2.5 x 0.03 = 0.075 t; 0.075 x 2,000,000 = 150,000 t, which agrees.
- Remaining material (gangue and other constituents) = 5,000,000 minus 150,000 = 4,850,000 t.
Step 4: Note on the result
- The figure is in situ contained metal; recoverable copper would be lower after mining dilution and losses and processing recovery (for example, at an assumed 85 per cent recovery it would be 127,500 t).
- Calling the tonnage 'proven' assumes it is derived from a Measured resource, the category of highest geological confidence, and is economically mineable.
Conclusion
Proven ore reserve = 5 million tonnes; copper contained = 150,000 tonnes (3 per cent of 5 million). Check: 2 x 10⁶ x 2.5 x 0.03 = 1.5 x 10⁵.
Examples and data to cite
- Hindustan Copper's Malanjkhand reserve is 208.03 million tonnes at 1.3 per cent Cu and its Khetri reserve 34.56 million tonnes at 1.13 per cent Cu, so a 3 per cent Cu deposit would be relatively rich.
Facts to remember
- Tonnage = volume x bulk (dry) density.
- Contained metal = tonnage x grade (as a fraction).
- Tonnage factor = volume per unit mass = 1 / density.
- Proved (proven) reserve is the highest confidence category of reserve in codes such as JORC; it is derived from a Measured resource.