A production process is monitored using X̄ and R charts. Fifteen subgroups of size n = 5 were inspected. The grand mean X̄ = 48·6 mm and the mean range R̄ = 4·2 mm. Use the following control chart constants :
A₂ = 0·577, D₃ = 0, D₄ = 2·114, where
A₂ is for the X̄ chart, D₃ and D₄ are for the R chart
(i) Compute the upper and lower control limits for both the X̄ chart and the R chart.
(ii) A separate attribute inspection of 20 lots of 200 units each found a total of 184 defective units. Construct a p-chart : compute p̄ , upper control limit (UCL-p) and lower control limit (LCL-p).

10 marks · directive: Compute

Answer

The core of a good answer

X̄ chart: CL 48·6, UCL 51·02, LCL 46·18 mm; R chart: CL 4·2, UCL 8·88, LCL 0 mm; p-chart: p̄ = 184/4000 = 0·046, UCL = 0·0904 and LCL = 0·0016.

An outline written by upsc.help, not an official UPSC answer; every fact checked by a separate review. How we work

What the question asks

Shewhart control limits. For variables: X̄ limits X̿ ± A₂R̄, R limits D₃R̄ and D₄R̄. For attributes with constant sample size: p̄ ± 3√(p̄(1 − p̄)/n).

Answer outline

Introduction

Variables data: 15 subgroups of n = 5, X̿ = 48·6 mm, R̄ = 4·2 mm. Attribute data: 20 lots × 200 = 4000 units inspected, 184 defective.

Step 1: X̄ chart

Step 2: R chart

Step 3: p̄

Step 4: p-chart limits

Step 5: Use

Conclusion

X̄: 46·18 to 51·02 mm; R: 0 to 8·88 mm; p: 0·0016 to 0·0904 about p̄ = 0·046. The R chart should be checked in control first, since the X̄ limits use R̄. (Recomputed in Python.)