Dam failures are always catastrophic, especially on the downstream side, resulting in a colossal loss of life and property. Analyze the various causes of dam failures. Give two examples of large dam failures.
Question source: synopsisias.com
Write a timed answer in the appCurrent affairs to use in your answer
Use it to conclude that dam safety and downstream risk must be built into clearance of new large dams, especially in seismic Himalayan basins.
- NHPC's 1,605 MW Subansiri Upper project involves a 237-metre dam in a young, earthquake-prone mountain range, upstream of Assam on a major Brahmaputra tributary.
- Downstream, construction of the 2,000 MW Subansiri Lower was stalled by protests from 2011 over dam safety and downstream impact; an independent review under the Dam Safety Act, 2021 is suggested.
- Environmental clearance is granted under the EIA Notification, 2006, issued under the Environment (Protection) Act, 1986; Category A projects are appraised by sectoral Expert Appraisal Committees of the Union Environment Ministry.
- Diversion of forest land for non-forest use needs separate approval under the Forest (Conservation) Act, 1980, renamed the Van (Sanrakshan Evam Samvardhan) Adhiniyam, 1980 in 2023.
- Money collected for compensatory afforestation is managed under the Compensatory Afforestation Fund Act, 2016, through CAMPA.
Cite the Chungthang breach to show that external hazards like glacial lake outbursts are a cause of dam failure in the Himalaya.
- In October 2023 the South Lhonak glacial lake in Sikkim burst, and the flood down the Teesta breached the Chungthang dam.
- GLOFs are sudden releases of water held by a glacier or moraine; heavy rain, ice or rock avalanches, landslides and earthquakes can breach such natural dams.
- Remedies: NDMA's October 2020 GLOF guidelines cover lake mapping, early warning, lake lowering and community training; risk assessment is also needed for all infrastructure downstream of glacial lakes.
- On 3 September 2026, Union Home Secretary Govind Mohan reviewed GLOF and avalanche preparedness of Uttarakhand, Himachal Pradesh, Sikkim, Arunachal Pradesh and Jammu and Kashmir.
- States were asked to shift to risk-informed planning, preventive mitigation and community-level preparedness, and to speed up GLOF mitigation projects sanctioned in 2024.
- The National GLOF Risk Mitigation Project (₹150 crore, approved August 2024) covers Arunachal Pradesh, Himachal Pradesh, Sikkim and Uttarakhand and targets 189 high-risk lakes.
River structures in Bihar show how barrages and embankments create downstream and upstream hazards, supporting the causes part of the answer.
- Critics say the Farakka Barrage, operational since 1975 to divert Ganga water to the Hooghly, traps silt upstream, raising flood frequency in Bihar.
- Bihar's more than 3,730 km of embankments raise river beds through silt deposition; the 2008 Kosi embankment breach shows how such structures can fail suddenly.
- Policy point: manage sediment at and above Farakka and strengthen flood forecasting on the Ganga main stem, not only on Nepal-fed rivers.
- By 9 September 2026, floods had affected about 40.51 lakh people in 2,157 villages across 14 Bihar districts despite a 27% rain deficit from 1 June to 8 September.
- In 2026 the Ganga rose before the Nepal-fed rivers (Bagmati, Kamla, Kosi, Gandak), causing a backwater effect on tributaries such as the Gandak and the Punpun.
- The Farakka Barrage, on the Ganga in Murshidabad district of West Bengal, became operational in 1975 to divert water to the Hooghly for Kolkata port.
Kishau, a very tall dam in the seismic Himalaya upstream of Delhi, lets you argue that new storage must build in safety review from the start.
- Kishau will be a 232.6-metre concrete gravity dam on the Tons on the Himachal Pradesh-Uttarakhand border, a seismic Himalayan setting.
- Concerns flagged with the project include seismic and safety risk, displacement and rehabilitation, and cost escalation before construction begins.
- Way forward: independent safety review and transparent monitoring for Kishau under the Dam Safety Act framework.
- Six States (Uttar Pradesh, Uttarakhand, Himachal Pradesh, Rajasthan, Delhi, Haryana) signed the Kishau Multipurpose Project agreement on 15 September 2026.
- Kishau is a 232.6-metre concrete gravity dam on the Tons, a tributary of the Yamuna, on the Himachal Pradesh-Uttarakhand border.
- It will store 1,562 million cubic metres, irrigate about 97,000 hectares and generate 1,476 million units of power, per the Home Ministry.
Use the Siang and Medog projects to show why dam-safety concerns weigh heavily in seismically active Himalayan basins with upstream structures.
- China began building the roughly 60 GW Medog project on the Yarlung Tsangpo on 19 July 2025, about 40 km from the Indian border.
- Adi opponents of the Siang project cite dam safety in a seismically active region as a key concern.
- The Arunachal government argues a 9.2 billion cubic metre Indian reservoir could absorb sudden upstream surges.
- The Siang Upper Multipurpose Project is a proposed 11,200 MW project on the Siang in Arunachal Pradesh, declared a National Project on 7 February 2008.
- On 2 November 2026 CM Pema Khandu said no construction decision has been taken and none will be without public consultation and consent of affected people.
- The project is at the pre-feasibility stage; a Social Impact Assessment, Environmental Impact Assessment and Detailed Project Report would follow if it is viable.
Where it sits in the syllabus
- GS3: Conservation, pollution, EIA
Conservation, environmental pollution and degradation, environmental impact assessment.
- GS3: Infrastructure
Infrastructure: Energy, Ports, Roads, Airports, Railways etc.
- GS3: Disaster management
Disaster and disaster management.
- GS3: Crops, irrigation, farm marketing
Major crops, cropping patterns in various parts of the country, different types of irrigation and irrigation systems, storage, transport and marketing of agricultural produce and issues and related constraints; e-technology in the aid of farmers.
Other questions these stories help answer
- 2026 · GS3 · 10 marks Discuss how the contradiction between 'rapid infrastructure development' and 'disaster-risk reduction' in ecologically-sensitive areas of India can be managed, with suitable examples.
- 2025 · GS1 · 15 marks Does tribal development in India centre around two axes, those of displacement and of rehabilitation? Give your opinion.
- 2024 · GS3 · 15 marks India has a long and troubled border with China and Pakistan fraught with contentious issues. Examine the conflicting issues and security challenges along the border. Also give out the development…
- 2023 · GS1 · 10 marks Why is the South-West Monsoon called 'Purvaiya' (easterly) in Bhojpur Region? How has this directional seasonal wind system influenced the cultural ethos of the region?
- 2020 · GS3 · 10 marks How does the draft Environment Impact Assessment (EIA) Notification, 2020 differ from the existing EIA Notification, 2006?
- 2020 · GS3 · 15 marks Suggest measures to improve water storage and irrigation system to make its judicious use under depleting scenario.
- 2019 · Prelims Consider the following pairs: Glacier : River 1. Bandarpunch : Yamuna 2. Bara Shigri : Chenab 3. Milam : Mandakini 4. Siachen : Nubra 5. Zemu : Manas Which of the pairs given above are correctly…
- 2017 · GS3 · 15 marks 'Climate Change' is a global problem. How India will be affected by climate change? How Himalayan and coastal states of India will be affected by climate change?